Riprap Isbash Scale and Material Budget

Explore the classical Isbash stone-diameter relation and estimate bulk layer volume, mass and cost using explicit assumptions.

  • Formula & worked example
  • Private in your browser
  • No signup
Go to tool

Calculator inputs

Loading calculator…

How to use this calculator

  1. Enter the known values in the units shown. Results update as you type.
  2. Where results are editable, change one to solve backwards. Lock a value to hold it fixed.
  3. Use the worked example to check the method. Reset restores the starting fields.

Private by default

Inputs and results stay in this browser tab. Bookify does not upload or store the values you enter.

Formula and method

For the classical relation with 2 m/s velocity, relative solid density 3, g = 10 m/s² and low-turbulence coefficient 1.2, the calculated diameter scale is approximately 6.944444 cm.

D = V²/[2gK²(S−1)]; bulk volume = area × depth; ordered volume = volume × (1+waste%).

Worked example

Enter these known values and leave the other values blank.

I want to find the...
average rock diameter (D₅₀)
Water velocity (V)
2 m/s
Specific gravity (S)
3
Gravitational acceleration (g)
10 m/s²
Isbash constant (C)
Low turbulence (1.2)
Average rock diameter (D₅₀)
6.944 cm

Assumptions and limitations

  • The classical Isbash scale assumes fully submerged stone and a selected empirical stability coefficient. It omits bank slope, bends, local turbulence corrections, depth, filters, scour, gradation and installation checks. It is an educational relation and quantity allowance; it does not establish site-specific riprap design.
  • Coefficient choices 0.86 and 1.20 are retained classical high- and low-turbulence conventions described in USACE EM 1110-2-1601 Appendix F. Bulk density is the installed rock-layer bulk density including voids, distinct from the solid-rock specific gravity used by the diameter relation.
  • Depth is a user planning input and is not derived from calculated diameter. Prices replace defaults; added waste increases ordered bulk volume.
  • Clear an unknown before solving backward. Currency controls represent the chosen denomination without exchange rates; prices must use the selected denominator units.

Common questions

What is included in this estimate?

The classical Isbash scale assumes fully submerged stone and a selected empirical stability coefficient. It omits bank slope, bends, local turbulence corrections, depth, filters, scour, gradation and installation checks. It is an educational relation and quantity allowance; it does not establish site-specific riprap design.